SOLUTIONS

Bridge Deck Cable Installations

Split bridge punches for deck cable installs — 700 bar pump driven, high vertical base included.

Key points

  • Split head for deck runs
  • 700 bar pump driven
  • 300 mm high vertical base

About this solution

Split bridge punches for deck cable installs — 700 bar pump driven, high vertical base included.

Recommended tool lines

Punch cable tray, trunking and C-channel on the spot — no pre-hole, up to Ø35 mm, rotatable heads for installed runs.

Browse all models in this line →