SOLUTIONS
Bridge Deck Cable Installations
Split bridge punches for deck cable installs — 700 bar pump driven, high vertical base included.
Key points
- Split head for deck runs
- 700 bar pump driven
- 300 mm high vertical base
About this solution
Split bridge punches for deck cable installs — 700 bar pump driven, high vertical base included.
Recommended tool lines
Punch cable tray, trunking and C-channel on the spot — no pre-hole, up to Ø35 mm, rotatable heads for installed runs.
Browse all models in this line →Need a recommendation for your project?
Tell us your conductor size, sheet thickness or rebar diameter — we will recommend the right tool combination.
